Week 10 saw the insulation going in along with the first floor wiring.
The sockets and switches have been located by having their housings screwed to the beams. This came as a great shock as we had been told that we would be able to decide on these much later. Today, Jan 6th, I am off to meet the builder to put some of these correct. Also have a list of lots of other things to discuss.
Here are the photos from week 10.